Project executed by Servicios Medioambientales, S.A. (SAMESA España).

OVIEDO, SPAIN
Project executed by Servicios Medioambientales, S.A. (SAMESA España).

ASTURIAS, SPAIN
1,500 m³ tank for the storage and regulation of treated wastewater prior to reuse, further treatment, or controlled discharge.Project executed by Servicios Medioambientales, S.A. (SAMESA España).

CIUDAD REAL, SPAIN
Cooling system designed for the controlled cooling of fluids generated during blowdown, drainage, or cleaning operations within the plant’s process circuits. The equipment reduces fluid temperature before recovery, recirculation, treatment, or discharge, protecting downstream piping and equipment. Photovoltaic plant, Ciudad Real, Spain..Project executed by Servicios Medioambientales, S.A. (SAMESA España).

AVILÉS, ASTURIAS, SPAIN
Pre-treatment of wastewater from industrial processes, hotels, restaurants, and food processing operations. Gravity separation retains fats, oils, and floating solids before the effluent reaches the sewage network or treatment plant. Manufactured from corrosion-resistant materials, the system incorporates settling chambers, inlet and outlet systems, an inspection access point, and access for periodic cleaning and waste removal.Project executed by Servicios Medioambientales, S.A. (SAMESA España).

DOMINICAN REPUBLIC
A compact modular system designed to treat drinking water from wells, surface water sources, or supply networks with inadequate water quality. This particular system has an estimated treatment capacity of 75–110 m³/day. Its modular construction is corrosion-resistant and allows for easy expansion and maintenance.Project executed by Servicios Medioambientales, S.A. (SAMESA España).

GIJON, SPAIN
Design, supply, and installation of a modular system for the controlled cooling and recirculation of process water. The installation incorporates heat exchange equipment, pumping, filtration, instrumentation, and an electrical control panel, integrated into a compact structure to facilitate transportation, installation, and maintenance.Project executed by Servicios Medioambientales, S.A. (SAMESA España).

JAEN, SPAIN
Installation for the pre-treatment of water contaminated with oils, fuels, and other hydrocarbons from industrial surfaces. The system performs physical separation based on density differences, retaining floating hydrocarbons and settleable solids before discharge or further treatment. The installation incorporates separation chambers, coalescing elements, retention tanks, inspection access points, and maintenance platforms, ensuring safe operation and reducing the pollutant load of the effluent.Project executed by Servicios Medioambientales, S.A. (SAMESA España).




CAP CANA, DOMINICAN REP
Luxury hotel located within the exclusive Cap Cana development. General contractor for all areas, including 177 rooms, lobby, amphitheater, restaurants, technical installations, outdoor facilities, swimming pools, and auxiliary services. Total construction area: 36,986 m². Execution period: 16 months.Project executed by Deconalva.





PUNTA CANA, DOMINICAN REP.
Club Mediterranee, one of the pioneering resorts in the Punta Cana area. General contractor for the transformation of its 343 rooms and the construction of additional facilities, including 36 new suites, swimming pools, a Mini Club, restaurants, a theater, service areas, technical installations, external structures, access roads, and auxiliary service facilities. Total construction area: 38,432 m². Execution period: 8 months.Project executed by Deconalva.




SAINT ANNE, JAMAICA
Hotel Bahia Principe Grand Jamaica, located in Runaway Bay, St. Ann Parish, Jamaica. General contractor for the construction of 550 rooms and all social areas, including the lobby, amphitheater, restaurants, central service facilities, and other amenities.Total construction area: 78,124 m². Execution period: 12 months.Project executed by Deconalva.




SAMANÁ, DOMINICAN REP.
Five-star hotel. General contractor for 319 rooms and social areas, including a casino, nightclub, three swimming pools, Jacuzzis, spa, shops, reading lounge, and gym. Complete technical installations. Total construction and renovation area: 26,624 m². Execution period: 17 months.Project executed by Deconalva.




SAMANA, DOMINICAN REP.
Luxury Bahia Principe Cayo Levantado Hotel. General contractor for 219 rooms and social areas, including four restaurants, four bars, tennis courts, four swimming pools, docks, and a helipad.
Total area of new construction and renovated facilities: 14,675 m². Located on Cayo Levantado Island, Samaná, Dominican Republic. Execution period: 17 months.Project executed by Deconalva.



ZONA COLONIAL, DOMINICAN REP.
Luxury hotel with 121 rooms. General contractor, including technical and service installations, water treatment plants, and general facilities. Total construction area: 11,263 m². The project was developed on the former residence of Nicolás de Ovando, Governor of Hispaniola, present-day Dominican Republic, from 1502 to 1509. The house was built between 1502 and 1503 and is considered the first stone house built in the Americas. Together with Casa de los Dávila, the Chapel of the Remedies, and three adjoining houses commissioned by Ovando, the original colonial structure was carefully studied and faithfully restored. All original components were meticulously preserved. Execution period: 24 months.Project executed by Deconalva.



SAINT KITTS & NEVIS
Project executed by Deconalva.





SAINT KITTS & NEVIS
Boutique Hotel & Luxury Villas. General contractor for 14 villas, including all technical installations, service areas, access roads, perimeter fencing, and landscaping. Total construction area: 16,683 m². Execution period: 14 months.Project executed by Deconalva.




ZONA COLONIAL, DOMINICAN REP.
Luxury boutique hotel. Conversion of a 17th-century colonial house in Santo Domingo’s Colonial Zone into a 20-room hotel featuring a dining room, Spanish courtyard, restaurant, kitchen, lounge areas, and bar. General contractor. Total renovated area: 1,678 m². The original colonial structure was carefully studied and faithfully restored. All original components were meticulously preserved. Execution period: 11 months.Project executed by Deconalva.



SANTO DOMINGO, DOMINICAN REP.
24-level residential building (-4/+2/+18) comprising 36 residential units. General contractor, including technical installations and auxiliary services. Total construction area: 21,671 m². Execution period: 14 months..Project executed by Deconalva.